AJ Tensile News Archive: 2018 March

One of our canopies just doing its job..!

Date posted: 8 March 2018
Posted in: Manufacturing, Tension Structures

Keep the snow off the entrance to your building with a canopy by A J Tensile Tension Structures Ltd.

AJT Biogas projects in Water & Wastewater Treatment magazine

Date posted: 8 March 2018
Posted in: Uncategorized

Of the ten treatment sites listed in this article, 60% of them are A J Tensile Biogas Systems Projects: Great Billing, Cardiff Bay, Budds Farm, Davyhulme, Avonmouth and Knostrop.

(Right-click the image and ‘open image in new tab’ to read the article)

Source: Water & Wastewater Treatment for the Wholesale Market magazine, March 2018 (Volume 61, Issue 3)

 

 

 

 

Sandown inflation test

Date posted: 6 March 2018
Posted in: Biogas Systems, Manufacturing, Tensile Fabrications, Uncategorized

Inflation test at our production facility of the inner liner for a 975 cubic metre gasholder at Sandown, Isle of Wight.

Malaysia Gasholders

Date posted: 6 March 2018
Posted in: Biogas Systems, Manufacturing, Tensile Fabrications

The second of three large gasholders having the finishing touches applied at our Caldicot production facility before being carefully packed, crated up and shipped to Malaysia.